Public entities · checked against official sources as of October 7, 2026

Government claim deadlines by state

If a city, county, state agency, transit agency or public airport caused the injury, many states require a written notice of claim first, often within months, before a lawsuit.

A lawyer can check which deadline applies to you. This tool does not decide whether a claim is late.

Notice deadlines by state

We list a rule only after checking it against the statute or an official source. If a state shows no rule, we have not verified one yet.

Alabama

Alabama government claim deadline rows
CitiesMunicipalities only.6 monthsfrom accrual of the tort claimMunicipal clerkNot stated in the sourceNot stated in the sourceAla. Code § 11-47-23Official Alabama Legislature code page located; personal injury municipal claims may also require a sworn statement under Ala. Code § 11-47-192.
CountiesCounties only.12 monthsafter the claim accrues or becomes payableCounty commissionNot stated in the sourceAction may not start until the county commission disallows or reduces the claim; 90 days without action is a disallowance.Ala. Code §§ 11-12-8, 6-5-20Official Alabama Legislature code page located for the 12-month deadline. Minors and persons deemed lunatic get 12 months after disability removal under § 11-12-8.

Alaska

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

Arizona

Arizona government claim deadline rows
State agenciesState public entities and public employees.180 daysafter the cause of action accruesPerson or persons authorized to accept service for the public entity or employee under the Arizona Rules of Civil ProcedureNot stated in the sourceClaim is deemed denied 60 days after filing unless denied in writing earlier; actions against public entities/public employees must be brought within 1 year after accrual.Ariz. Rev. Stat. §§ 12-821.01, 12-821Minor or incompetent claimant may file within 180 days after disability ceases; claim must state a specific settlement amount and supporting facts.
Local public entitiesCities, counties, political subdivisions, public schools, and public employees.180 daysafter the cause of action accruesPerson or persons authorized to accept service for the public entity, public school, or public employee under the Arizona Rules of Civil ProcedureNot stated in the sourceClaim is deemed denied 60 days after filing unless denied in writing earlier; actions against public entities/public employees must be brought within 1 year after accrual.Ariz. Rev. Stat. §§ 12-821.01, 12-821Same rule covers public schools. Minor or incompetent claimant may file within 180 days after disability ceases.

Arkansas

Arkansas government claim deadline rows
State agenciesState of Arkansas, its agencies, and institutions; Arkansas Claims Commission route.Within the period allowed for the same type of claim against a private personwithin the private-action limitations period for that claim typeDirector of the Arkansas State Claims CommissionClaims Commission complaint formNot stated in the sourceArk. Code § 19-10-209; Arkansas Claims Commission Rule 1.5The deadline is claim-type dependent, not a single tort-notice number; Claims Commission rules require the original claim form by the statutory time limit.

California

California government claim deadline rows
State agenciesState of California agencies and employees.6 months for death, personal injury, or personal property; 1 year for other claimsfrom the injury/incident or accrual dateDepartment of General Services, Office of Risk and Insurance Management, Government Claims ProgramDGS ORIM 006 Government Claim Form6 months from the date the rejection was mailed; if no response, generally up to 2 years from injury date.Cal. Gov. Code §§ 911.2, 945.6Late-claim application may be possible; public-entity and claim-type exceptions exist.
Local public entitiesCities, counties, and other California public entities.6 months for death, personal injury, or personal property; 1 year for other claimsfrom the injury/incident or accrual dateThe public entity being asked to pay; use that city, county, transit agency, airport authority, or district's claim processNot stated in the source6 months from the date the rejection was mailed; if no response, generally up to 2 years from injury date.Cal. Gov. Code §§ 911.2, 915, 945.6Find the specific claim form for the local public entity; late-claim rules may apply.

Colorado

Colorado government claim deadline rows
State agenciesState public entities and employees.182 daysafter the date of discovery of the injuryColorado Attorney GeneralNot stated in the sourceNo action until the public entity denies the claim or 90 days pass after notice, whichever occurs first.Colo. Rev. Stat. § 24-10-1092025/2026 title PDF was not available at the official URL; 2024 official CRS PDF fetched and verified.
Local public entitiesPublic entities other than the state, including cities, counties, districts, authorities, and their employees.182 daysafter the date of discovery of the injuryGoverning body of the public entity, the attorney representing the public entity, or the entity's listed agentNot stated in the sourceNo action until the public entity denies the claim or 90 days pass after notice, whichever occurs first.Colo. Rev. Stat. § 24-10-1092025/2026 title PDF was not available at the official URL; 2024 official CRS PDF fetched and verified.

Connecticut

Connecticut government claim deadline rows
State agenciesClaims against the State of Connecticut generally, through the Office of the Claims Commissioner.1 yearafter the claim accrues; injury/property damage accrues when sustained or discovered, with a 3-year outside limitOffice of the Claims CommissionerNotice of claim / claim formNot stated in the sourceConn. Gen. Stat. §§ 4-147, 4-148Claims Commissioner procedure has excluded-claim categories and special legislative late-claim authorization.
Local public entitiesMunicipal indemnity actions against municipalities and employees under Conn. Gen. Stat. § 7-465.6 monthsafter the cause of action accruedClerk of the municipalityNot stated in the sourceAction must be commenced within 2 years after the cause of action arose.Conn. Gen. Stat. § 7-465Direct municipal liability under § 52-557n can differ; highway/road defects have a separate 90-day notice rule.
Special ruleDefective municipal roads and bridges; towns, cities, boroughs, or corporations bound to repair.90 daysafter the injuryTown selectman or clerk; city or borough clerk; corporation secretary or treasurerNot stated in the sourceAction must be brought within 2 years from the date of injury.Conn. Gen. Stat. § 13a-149Road-defect statute is a special rule; adequacy of notice has case-law gloss.
Special ruleDefective state highways/sidewalks maintained by the Commissioner of Transportation.90 daysafter the injuryConnecticut Commissioner of TransportationNot stated in the sourceAction must be brought within 2 years from the date of injury.Conn. Gen. Stat. § 13a-144Applies to defective highway, bridge, or sidewalk claims under § 13a-144.

Delaware

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

District of Columbia

District of Columbia government claim deadline rows
Local public entitiesDistrict of Columbia government; DC has no separate state/local split for this purpose.6 monthsfrom the date of the incident or injury/damageOffice of Risk Management, on behalf of the Mayor of the District of ColumbiaNotice of Claim letterNot stated in the sourceD.C. Code § 12-309Police reports may satisfy notice only if they contain the required statutory information; notice provisions do not apply to some federal, DCHRA, whistleblower, liquidated-damages, or equitable claims.

Florida

Florida government claim deadline rows
State agenciesState of Florida and state agencies.3 yearsafter the claim accruesAppropriate state agency and the Florida Department of Financial ServicesNot stated in the sourceSuit cannot be filed until the Department of Financial Services or the agency denies the claim in writing, or after the statutory investigation period; wrongful death has a 2-year presentment period.Fla. Stat. § 768.28(6)Wrongful death must be presented within 2 years; contribution claims have separate timing.
Local public entitiesMunicipalities, counties, and other subdivisions.3 yearsafter the claim accruesAppropriate agency or subdivision; DFS notice is not required for claims against a municipality, county, or Florida Space AuthorityNot stated in the sourceSuit cannot be filed until written denial or the statutory investigation period has passed; wrongful death has a 2-year presentment period.Fla. Stat. § 768.28(6)For municipalities/counties, send notice to the local entity; for other subdivisions, confirm whether DFS notice is also required.

Georgia

Georgia government claim deadline rows
State agenciesState of Georgia entities under the Georgia Tort Claims Act.12 monthsfrom the date the loss was discovered or should have been discoveredRisk Management Division of the Department of Administrative Services and the state government entity whose acts or omissions are asserted as the basis of the claimNot stated in the sourceAction must be filed within the applicable period in O.C.G.A. § 50-21-27 after ante litem notice compliance.O.C.G.A. § 50-21-26sourceType=mirror; official Georgia code text was not fetchable. Verify exact service addresses before use.
CitiesMunicipal corporations.6 monthsfrom the happening of the event on which the claim is basedMayor or chairperson of the city council or city commission, served personally, by certified mail, or statutory overnight deliveryNot stated in the sourceNo action until the municipal governing authority acts or 30 days pass after presentment.O.C.G.A. § 36-33-5sourceType=mirror; official Georgia code text was not fetchable. Notice must state a specific amount of monetary damages sought.
CountiesCounties and county officials in official-capacity claims.12 monthsafter the claim accrues or becomes payableCounty; Georgia cases discuss presentment to county attorney/risk management depending on authority, but confirm the county recipientNot stated in the sourceNot stated in the sourceO.C.G.A. § 36-11-1sourceType=mirror; official Georgia code text was not fetchable. Minors and persons under disability get 12 months after disability removal.

Hawaii

Hawaii government claim deadline rows
Local public entitiesCounties, including streets, sidewalks, other public places, and county official/employee negligence.2 yearsafter the injuries accruedPerson identified in the county charter; if none, chairperson of the county council or county clerkNot stated in the sourceNot stated in the sourceHRS § 46-72The official PDF is a 2017 chapter PDF; verify current county-charter recipient before filing.

Idaho

Idaho government claim deadline rows
State agenciesState of Idaho and state employees.180 daysfrom the date the claim arose or reasonably should have been discoveredIdaho Secretary of StateNotice of Claim / Citizen's Claim formNo claim or action is allowed unless claim is presented and filed within Idaho Tort Claims Act time limits; denied-claim recourse is governed by the Act.Idaho Code § 6-905Official Idaho Legislature statute page replaces broken agency PDF link.
Local public entitiesPolitical subdivisions and their employees, including cities, counties, districts, and local public entities.180 daysfrom the date the claim arose or reasonably should have been discoveredClerk or secretary of the political subdivisionNot stated in the sourceNo claim or action is allowed unless claim is presented and filed within Idaho Tort Claims Act time limits; denied-claim recourse is governed by the Act.Idaho Code § 6-906Official Idaho Legislature statute page replaces Idaho Supreme Court PDF quote. Minors have special timing under Idaho Code § 6-906A.

Illinois

Illinois government claim deadline rows
State agenciesState of Illinois and listed state boards/universities for personal injury claims in the Court of Claims.1 year notice of intent, unless the claim itself is filed within 1 yearfrom the date injury was received or cause of action accruedOffice of the Attorney General and Clerk of the Illinois Court of ClaimsNot stated in the sourceNot stated in the source705 ILCS 505/22-1, 22-2Personal injury notice is separate from the Court of Claims filing deadlines in § 22; wrongful death notice has a separate 1-year/qualification rule.

Indiana

Indiana government claim deadline rows
State agenciesState of Indiana and state agencies.270 daysafter the loss occursIndiana Attorney General or the state agency involvedNotice of Tort Claim FormClaim is denied if not approved within 90 days; suit may not be initiated unless the claim has been denied in whole or part.Ind. Code §§ 34-13-3-6, 34-13-3-11, 34-13-3-13sourceType=mirror for statute because official IGA page required JavaScript. Indiana AG page confirms state tort-claim review and form availability.
Local public entitiesPolitical subdivisions and employees.180 daysafter the loss occursGoverning body of the political subdivision and the Indiana political subdivision risk management commissionNot stated in the sourceClaim is denied if not approved within 90 days; suit may not be initiated unless the claim has been denied in whole or part.Ind. Code §§ 34-13-3-8, 34-13-3-11, 34-13-3-13Official opinion quotes the political-subdivision rule; official IGA code page required JavaScript.

Iowa

Iowa government claim deadline rows
State agenciesState tort claims under Iowa Code chapter 669.2 yearsafter the claim accruedDirector of the Department of ManagementNot stated in the sourceSuit time is extended 6 months from mailing of final-disposition notice or withdrawal if otherwise expiring sooner.Iowa Code § 669.13Section 669.13 is the state claim/suit limitation; other Iowa administrative prerequisites may apply by claim type.

Kansas

Kansas government claim deadline rows
Local public entitiesMunicipalities and municipal employees under Kansas Tort Claims Act; includes cities, counties, school districts, and other municipal bodies as defined by K.S.A. 12-105a.Before commencing action; no fixed notice period, but action waits until denial or 120 daysbefore commencing a KTCA action against the municipality or employeeClerk or governing body of the municipalityNot stated in the sourceNo action until denial or 120 days pass; claimant has at least 90 days from denial/deemed denial to commence action.K.S.A. 12-105b(d)Childhood sexual abuse exception stated in subsection (d)(2); substantial compliance governs content.

Kentucky

Kentucky government claim deadline rows
State agenciesClaims against the Commonwealth, heard by the Kentucky Board of Claims.1 yearfrom the time the claim for relief accruedKentucky Board of ClaimsBoard of Claims online claim filingNot stated in the sourceKRS § 49.120Personal injury accrues at discovery, but no personal-injury action beyond 2 years from the negligent act or omission; disabilities do not extend beyond KRS 49.120.
CitiesCity bridge, street, sidewalk, alley, or other public thoroughfare defect claims.90 daysfrom the occurrence for which damage is claimedMayor, city clerk, or clerk of the board of aldermenNot stated in the sourceNot stated in the sourceKRS § 411.110Special city thoroughfare-defect rule; no separate statewide general local tort notice row was verified for all local claims.

Louisiana

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

Maine

Maine government claim deadline rows
State agenciesState of Maine and state employees.365 daysafter the claim or cause of action accruesState department, board, agency, commission, or authority whose act or omission caused the injury, and the Maine Attorney GeneralNot stated in the sourceNot stated in the source14 M.R.S. § 8107Good-cause late notice and minor/incapacity provisions are stated in § 8107.
Local public entitiesPolitical subdivisions and their employees.365 daysafter the claim or cause of action accruesA person on whom a summons and complaint could be served under Maine Rule of Civil Procedure 4 for that political subdivisionNot stated in the sourceNot stated in the source14 M.R.S. § 8107Good-cause late notice and minor/incapacity provisions are stated in § 8107.

Maryland

Maryland government claim deadline rows
State agenciesState of Maryland and state personnel under the Maryland Tort Claims Act.1 yearfrom the occurrence / injury, loss, or damageMaryland State Treasurer's OfficeNotice of Claim formMaryland Treasurer regulations require written claim submission before suit; general MTCA suit timing is governed by Md. Code, State Gov't § 12-106.Md. Code, State Gov't § 12-106Treasurer site provides the official filing route; verify designee rules for specific state entities.
Local public entitiesLocal governments and employees under the Local Government Tort Claims Act.1 yearafter the injuryCounty commissioners/county council; Baltimore City Solicitor; listed county executive/solicitor/county attorney for named counties; otherwise corporate authorities of the local governmentNot stated in the sourceNot stated in the sourceMd. Code, Cts. & Jud. Proc. § 5-304Court may allow suit for good cause absent prejudice; actual/constructive notice within 1 year can satisfy subsection (e).

Massachusetts

Massachusetts government claim deadline rows
State agenciesCommonwealth of Massachusetts, departments, agencies, authorities, and public employers.2 yearsafter the cause of action aroseAttorney General for claims against the Commonwealth; otherwise executive officer of the public employerAttorney General presentment claim formFinal written denial required; failure to deny within 6 months is deemed final denial. No civil action more than 3 years after accrual.Mass. Gen. Laws ch. 258, § 4Sexual abuse of a minor claims have separate rules; presentment is deemed sufficient to the Attorney General for Commonwealth claims.
Local public entitiesCities, towns, and other local public employers.2 yearsafter the cause of action aroseExecutive officer of the public employer; for cities/towns, mayor, city manager, town manager, corporation counsel, city solicitor, town counsel, city clerk, town clerk, select-board chair, or select-board executive secretary is sufficientNot stated in the sourceFinal written denial required; failure to deny within 6 months is deemed final denial. No civil action more than 3 years after accrual.Mass. Gen. Laws ch. 258, § 4Housing-authority small claims and sexual abuse of a minor claims have separate rules.

Michigan

Michigan government claim deadline rows
State agenciesState of Michigan; Court of Claims notice for property damage or personal injuries.6 months for property damage or personal injuries; 1 year otherwiseafter the event giving rise to the claim for property damage or personal injuriesClerk of the Michigan Court of ClaimsNot stated in the sourceNot stated in the sourceMCL § 600.6431Subsection (1) has a 1-year claim/notice rule except as otherwise provided; subsection (4) shortens property-damage/personal-injury claims to 6 months.
Special ruleDefective highway claims against any governmental agency, including state or local road agencies.120 daysfrom the time the injury occurredThe governmental agency responsible for the highwayNot stated in the sourceNot stated in the sourceMCL § 691.1404Special defective-highway condition-to-recovery rule; content must specify injury, defect, witnesses, and location.

Minnesota

Minnesota government claim deadline rows
State agenciesState of Minnesota, state employees, and University of Minnesota special recipient rule.180 daysafter the alleged loss or injury is discoveredMinnesota Attorney General; for University of Minnesota claims, the university attorney designated by the Regents; and any state employee from whom compensation will be soughtNot stated in the sourceNot stated in the sourceMinn. Stat. § 3.736, subd. 5Wrongful death notice may be given within 1 year; incapacity time is excluded.
Local public entitiesMunicipalities, counties, towns, school districts, public authorities, special districts, joint powers entities, and other political subdivisions within Minn. Stat. ch. 466.180 daysafter the alleged loss or injury is discoveredGoverning body of the municipalityNot stated in the sourceNot stated in the sourceMinn. Stat. § 466.05Wrongful death notice may be given within 1 year; actual notice of sufficient facts can comply.

Mississippi

Mississippi government claim deadline rows
State agenciesState entities under the Mississippi Tort Claims Act.At least 90 days before suit; notice must be filed within the 1-year action periodbefore instituting suit, within one year after the tortious, wrongful, or actionable conductChief executive officer of the state entityNot stated in the sourceNotice tolls limitations for 95 days; no action until denial or tolling period expires, whichever comes first, then claimant has an additional 90 days to file suit.Miss. Code § 11-46-11sourceType=mirror; official current code text was not fetchable. Infants and persons of unsound mind have savings provisions.
Local public entitiesCounties, municipalities, and other political subdivisions under the Mississippi Tort Claims Act.At least 90 days before suit; notice must be filed within the 1-year action periodbefore instituting suit, within one year after the tortious, wrongful, or actionable conductCounty: chancery clerk; municipality: city clerk; other political subdivision: chief executive officerNot stated in the sourceNotice tolls limitations for 95 days; no action until denial or tolling period expires, whichever comes first, then claimant has an additional 90 days to file suit.Miss. Code § 11-46-11sourceType=mirror; official current code text was not fetchable. Infants and persons of unsound mind have savings provisions.

Missouri

Missouri government claim deadline rows
CitiesCities with population of 100,000 or more; street/sidewalk/bridge/boulevard/thoroughfare defects only.90 daysof the occurrence for which damage is claimedmayor of the cityNot stated in the sourceNot stated in the sourceMo. Rev. Stat. § 82.210Special large-city road/sidewalk-defect rule; not a general notice rule for every Missouri public entity or every municipal premises claim.

Montana

Montana government claim deadline rows
State agenciesState agencies under Montana governmental liability chapter.before suit; within the applicable limitations periodunder the applicable limitation period for the claimMontana Department of AdministrationNot stated in the sourceclaim deemed denied if not granted or denied in writing within 120 daysMont. Code Ann. §§ 2-9-301, 2-9-302MCA 2-9-302 ties filing time to the otherwise applicable limitation period rather than a separate fixed notice period.
Local public entitiesPolitical subdivisions under Montana governmental liability chapter.before suit; within the applicable limitations periodunder the applicable limitation period for the claimclerk or secretary of the political subdivisionNot stated in the sourceNot stated in the sourceMont. Code Ann. §§ 2-9-301, 2-9-302MCA 2-9-302 ties filing time to the otherwise applicable limitation period rather than a separate fixed notice period.

Nebraska

Nebraska government claim deadline rows
State agenciesState Tort Claims Act.2 yearsafter the claim accruedRisk Manager, in the manner prescribed by the State Claims BoardState of Nebraska claim formsno suit until final disposition; if no disposition within 6 months, claimant may withdraw and sue; 6-month extension after final disposition/withdrawal if limitations would otherwise expireNeb. Rev. Stat. §§ 81-8,212, 81-8,213, 81-8,227State suit is conditioned on final disposition or withdrawal after 6 months.
Local public entitiesPolitical subdivisions, including cities, counties, school districts and listed local bodies.1 yearafter the claim accruedgoverning body; filing mechanics in §13-905 use clerk, secretary, records official, or designated law departmentNot stated in the sourceno suit until governing body disposition; if no disposition within 6 months, claimant may withdraw and sue; 6-month extension if limitations would otherwise expireNeb. Rev. Stat. §§ 13-905, 13-906, 13-919File-with details are in §13-905; timing is in §13-919.

Nevada

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

New Hampshire

New Hampshire government claim deadline rows
State agenciesClaims against state agencies under RSA 541-B.180 daysafter the time of the injury or damagethe agency; Board of Claims handles claims against state agenciesFormNot stated in the sourceN.H. Rev. Stat. Ann. § 541-B:14Lack of notice does not bar the claim unless the agency proves substantial prejudice.
Local public entitiesGovernmental units under RSA 507-B, including municipal subdivisions.60 daysafter the injury or damage, or discovery if not reasonably discoverable at occurrenceclerk of the governmental unit by registered mailNot stated in the sourceNot stated in the sourceN.H. Rev. Stat. Ann. § 507-B:7Governmental unit must show substantial prejudice where lack of notice, actual knowledge, or opportunity to obtain knowledge is alleged.

New Jersey

New Jersey government claim deadline rows
State agenciesState of New Jersey departments, agencies, officials, and employees.90 daysfrom occurrence, incident, accident, discovery, or accrual dateNew Jersey Department of the Treasury, Division of Risk Management digital claim portalNotice of Tort and Contract Claimafter 6 months from notice receipt; two-year outer limit from accrualN.J. Stat. Ann. § 59:8-8; NJ Treasury Division of Risk ManagementState portal says local/county/municipal claims must be filed directly with those entities.
Local public entitiesPublic entities other than the state; local forms vary by entity.90 daysafter accrual of the cause of actionthe public entity being claimed againstNot stated in the sourceafter 6 months from notice receipt; two-year outer limit from accrualN.J. Stat. Ann. §§ 59:8-7, 59:8-8Mirror source used because official statute text was not fetched; NJ Courts says entities often have their own forms.

New Mexico

New Mexico government claim deadline rows
State agenciesState Tort Claims Act claims against the state.90 daysafter an occurrence giving rise to a claimRisk Management DivisionNot stated in the sourceNot stated in the sourceN.M. Stat. Ann. § 41-4-16Mirror source used because no official public statute text was fetched; wrongful death notice is 6 months; actual notice may substitute.
CitiesMunicipal Tort Claims Act claims.90 daysafter an occurrence giving rise to a claimmayor of the municipalityNot stated in the sourceNot stated in the sourceN.M. Stat. Ann. § 41-4-16Mirror source used because no official public statute text was fetched; wrongful death notice is 6 months; actual notice may substitute.
CountiesCounty Tort Claims Act claims.90 daysafter an occurrence giving rise to a claimcounty clerkNot stated in the sourceNot stated in the sourceN.M. Stat. Ann. § 41-4-16Mirror source used because no official public statute text was fetched; wrongful death notice is 6 months; actual notice may substitute.
SchoolsSchool district Tort Claims Act claims.90 daysafter an occurrence giving rise to a claimsuperintendent of the school districtNot stated in the sourceNot stated in the sourceN.M. Stat. Ann. § 41-4-16Mirror source used because no official public statute text was fetched; wrongful death notice is 6 months; actual notice may substitute.

New York

New York government claim deadline rows
State agenciesState of New York claims in the Court of Claims.90 daysafter accrual of the claimNew York Court of Claims and serve the New York Attorney General; notice of intention may preserve timeNot stated in the sourceif notice of intention is served within 90 days, negligence claim must be filed and served within 2 years after accrualN.Y. Court of Claims Act § 10(3)Official site was browser-fetched but blocked direct curl; intentional tort and wrongful death timing differs.
Local public entitiesPublic corporations covered by General Municipal Law notice-of-claim rules.90 daysafter the claim arises; wrongful death runs from appointment of estate representativethe public corporation required by law to receive serviceNot stated in the sourcetypically at least 30 days after notice demand/neglect/refusal and within 1 year 90 days for tort claims under GML 50-iN.Y. Gen. Mun. Law §§ 50-e, 50-iChild Victims Act/revival exceptions and entity-specific statutes can change the rule.
transitPort Authority of New York and New Jersey, including JFK and other PANYNJ facilities.at least 60 days before suitbefore the action is commenced; suit must be within 1 year after accrualPort Authority of New York and New JerseyNot stated in the sourceaction must be commenced within 1 year after accrualN.Y. Unconsol. Laws § 7107Official source was browser-fetched/search-fetched but blocked direct curl; this is a special authority rule, not GML 50-e.

North Carolina

North Carolina government claim deadline rows
State agenciesState departments, institutions, and agencies under the State Tort Claims Act.3 yearsafter accrual of the claimNorth Carolina Industrial CommissionNot stated in the sourceNot stated in the sourceN.C. Gen. Stat. §§ 143-297, 143-299Wrongful death state tort claim deadline is 2 years after death.

North Dakota

North Dakota government claim deadline rows
State agenciesClaims against the state or state employee.180 daysafter the alleged injury is discovered or reasonably should have been discovereddirector of the Office of Management and BudgetNot stated in the sourceNot stated in the sourceN.D. Cent. Code § 32-12.2-04Serious-injury notice period is 1 year; incapacity time excluded; some sexual-act claims waive notice time.

Ohio

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

Oklahoma

Oklahoma government claim deadline rows
State agenciesOklahoma Governmental Tort Claims Act claims against the state.1 yearfrom the date the loss occursOffice of the Risk Management Administrator, Office of Management and Enterprise ServicesOMES Risk Management claim form180 days after denial or deemed denial; deemed denied after 90 days if not approved51 Okla. Stat. §§ 156, 157Incapacity can extend notice time up to 90 days; wrongful death notice may be within 1 year after death.
Local public entitiesPolitical subdivisions under the Oklahoma Governmental Tort Claims Act.1 yearfrom the date the loss occursoffice of the clerk of the governing bodyNot stated in the source180 days after denial or deemed denial; deemed denied after 90 days if not approved51 Okla. Stat. §§ 156, 157Same one-year deadline as state claims; local procedural policies may add form details.

Oregon

Oregon government claim deadline rows
State agenciesOregon Tort Claims Act public bodies, including the state.180 daysafter the alleged loss or injurypublic body; formal notice to state must be mailed or delivered to DAS, Attorney General, or state agency/person responsible for administering claimsNot stated in the sourceaction must be commenced within 2 years after the alleged loss or injuryOr. Rev. Stat. § 30.275Wrongful death notice is 1 year; incapacity/minority exclusions may apply up to 90 days; actual notice or timely suit can satisfy notice.
Local public entitiesOregon Tort Claims Act public bodies, including cities, counties, districts, transit, and schools.180 daysafter the alleged loss or injurythe public body; formal notice by mail or personal delivery to listed officials or claims administratorNot stated in the sourceaction must be commenced within 2 years after the alleged loss or injuryOr. Rev. Stat. § 30.275Wrongful death notice is 1 year; actual notice or timely suit can satisfy notice.

Pennsylvania

Pennsylvania government claim deadline rows
State agenciesCommonwealth agencies/government units.6 monthsfrom the date injury was sustained or cause of action accruedoffice of the government unit and, for Commonwealth agency damages claims, also the Office of Attorney GeneralNot stated in the sourceNot stated in the source42 Pa. Cons. Stat. § 5522(a)Court may excuse failure on reasonable excuse; vehicle-liability exceptions in §5522(c).
Local public entitiesGovernment units other than the Commonwealth.6 monthsfrom the date injury was sustained or cause of action accruedoffice of the government unitNot stated in the sourceNot stated in the source42 Pa. Cons. Stat. § 5522(a)For non-Commonwealth units, incapacity up to 90 days is excluded and actual/constructive notice can avoid bar.

Rhode Island

Rhode Island government claim deadline rows
Local public entitiesCities and towns, general claims or demands.present claim before suit; city/town has 40 days after presentment to satisfybefore action against the treasurertown council or city councilNot stated in the sourcemay sue treasurer if not satisfied within 40 days after presentmentR.I. Gen. Laws § 45-15-5Special highway/bridge injury notice has a fixed 60-day deadline under §45-15-9.
CitiesHighway, causeway, or bridge injuries involving city/town repair duties.60 daysafter injury or damagethe town/city obliged to keep the highway, causeway, or bridge in repairNot stated in the sourcewithin 3 years after injury or damage if not satisfied after presentment periodR.I. Gen. Laws § 45-15-9Applies to highway/causeway/bridge repair claims; use local counsel for other public premises.

South Carolina

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

South Dakota

South Dakota government claim deadline rows
State agenciesState and state employees under SDCL chapter 3-21.180 daysafter the injurySouth Dakota Attorney General and Commissioner of Human Resources and AdministrationNot stated in the sourcenotice does not toll or extend any applicable limitation periodS.D. Codified Laws §§ 3-21-2, 3-21-3Official single-section site is JS-heavy; official API/search text was fetched.
Local public entitiesCounties, municipalities, school districts, and other public entities under SDCL chapter 3-21.180 daysafter the injurycounty auditor; mayor or city finance officer; school superintendent; or chief executive/secretary of governing boardNot stated in the sourcenotice does not toll or extend any applicable limitation periodS.D. Codified Laws §§ 3-21-2, 3-21-3Official single-section site is JS-heavy; official API/search text was fetched.

Tennessee

Tennessee government claim deadline rows
State agenciesClaims against the State of Tennessee handled by Division of Claims and Risk Management.within applicable statute of limitations for similar occurrencesfrom the occurrence under the applicable limitations statuteTennessee Division of Claims and Risk Management online portalonline claim portal90 days to file with Claims Commission after denial/settlement notice; automatic transfer if no action in 90 daysTenn. Code Ann. § 9-8-402Mirror used for statute because official code text was not fetched; Tennessee Treasury official page verifies state claim portal.

Texas

Texas government claim deadline rows
State agenciesTexas Tort Claims Act governmental units, including the state.6 monthsafter the day the incident giving rise to the claim occurredthe governmental unitNot stated in the sourceNot stated in the sourceTex. Civ. Prac. & Rem. Code § 101.101Actual notice can excuse formal notice; city charter/ordinance provisions may require shorter notice.
Local public entitiesTexas Tort Claims Act governmental units, including local governments.6 monthsafter the day the incident giving rise to the claim occurredthe governmental unitNot stated in the sourceNot stated in the sourceTex. Civ. Prac. & Rem. Code § 101.101Actual notice can excuse formal notice; some city charters/ordinances have shorter deadlines.

Utah

Utah government claim deadline rows
State agenciesGovernmental Immunity Act claims against the state.1 yearafter the claim arisesUtah Attorney General, unless an authorized agent is listed in the governmental entity statementFormgenerally 1 year after denial or denial period expiration; check current §63G-7-403Utah Code §§ 63G-7-401, 63G-7-402, 63G-7-403Use Utah Department of Commerce GIA lookup for designated notice addresses/agents.
Local public entitiesCities, counties, school districts, special districts, boards and other governmental entities.1 yearafter the claim arisesoffice listed in §63G-7-401: city/town clerk, county clerk, school superintendent/business administrator, district board officer, or listed agentFormgenerally 1 year after denial or denial period expiration; check current §63G-7-403Utah Code §§ 63G-7-401, 63G-7-402, 63G-7-403Use Utah Department of Commerce GIA lookup for designated notice addresses/agents.

Vermont

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

Virginia

Virginia government claim deadline rows
State agenciesCommonwealth and transportation districts.1 yearafter the cause of action accruedDirector of Division of Risk Management or Attorney General; VDOT claims to Commissioner of HighwaysNot stated in the sourceNot stated in the sourceVa. Code § 8.01-195.6Actual knowledge within one year can avoid the bar; disability tolling may apply.
Local public entitiesCounties, cities, and towns.6 monthsafter the cause of action accruedcounty/city/town attorney, chief executive, or mayorNot stated in the sourceNot stated in the sourceVa. Code § 15.2-209Actual knowledge within six months can avoid the bar; statute supersedes conflicting older charters unless validly stated.

Washington

Washington government claim deadline rows
State agenciesClaims against Washington state or state officers/employees/volunteers.before suit; wait 60 days after presentmentwithin applicable limitations period before commencing actionOffice of Risk Management, Department of Enterprise Servicesstandard tort claim formno action until 60 calendar days after claim is presented; limitations tolled during 60-day periodWash. Rev. Code §§ 4.92.100, 4.92.110Washington specifies presentment and 60-day waiting period, not a fixed short notice deadline.
Local public entitiesLocal governmental entities and their officers/employees/volunteers.within applicable limitations period before suit; wait 60 days after presentmentwithin the applicable limitations periodagent appointed by the local governmental entity and recorded with county auditorNot stated in the sourceno action until 60 calendar days after claim is presented; limitations tolled during 60-day periodWash. Rev. Code § 4.96.020Local entity must record its claim agent; defective local form may waive certain defenses.

West Virginia

We have not verified a notice-of-claim rule for this state. That does not mean none applies. A lawyer can check which deadline applies.

Wisconsin

Wisconsin government claim deadline rows
State agenciesClaims against state officers, employees, or agents.120 daysof the event causing injury, damage, or deathWisconsin Attorney GeneralNot stated in the sourcespecific AG denial is generally not a condition precedent except prisoner claimsWis. Stat. § 893.82Strict compliance; service by personal service or certified mail; prisoner claims have added waiting rule.
Local public entitiesVolunteer fire companies, political corporations, governmental subdivisions or agencies, and their officers/employees/agents.120 daysafter the event giving rise to the claimthe governmental body/subdivision/agency and officer/employee under service rules; itemized claim to appropriate clerk/person performing clerk dutiesNot stated in the sourceitemized claim must be disallowed before suit; disallowance by inaction after 120 daysWis. Stat. § 893.80Actual notice plus no prejudice may save late notice; itemized claim/disallowance is a separate requirement.

Wyoming

Wyoming government claim deadline rows
State agenciesWyoming Governmental Claims Act claims against the state.2 yearsof the alleged act, error or omission; discovery rule if statutory conditions metGeneral Services Division, Department of Administration and InformationNot stated in the sourceaction forever barred unless commenced within 1 year after the claim is filedWyo. Stat. Ann. §§ 1-39-113, 1-39-114Claim must be signed under oath and plead compliance with Wyoming Constitution signature/certification requirements.
Local public entitiesCounties, cities/towns, school districts, special districts, airport boards, joint powers boards and other governmental entities.2 yearsof the alleged act, error or omission; discovery rule if statutory conditions metbusiness office of the entity: county clerk, city/town clerk, school superintendent, board secretary, etc.Not stated in the sourceaction forever barred unless commenced within 1 year after the claim is filedWyo. Stat. Ann. §§ 1-39-113, 1-39-114Local claim need not be acted on before suit; claim must be signed under oath.

Federal claims: FTCA and SF-95

Use the federal rule for claims against a federal agency, including TSA checkpoint injuries, national parks, federal buildings, and VA facilities. The agency can matter.

Federal Tort Claims Act notice row
Federal agenciesFederal Tort Claims Act: federal agencies, including TSA checkpoint claims and federal property claims.2 yearsafter the claim accruesappropriate Federal agency whose employee conduct gave rise to the injuryStandard Form 95 (Claim for Damage, Injury, or Death) or other written notice with a sum certain6 months after mailing of final denial; agency silence for 6 months may be treated as final denial at claimant's option28 U.S.C. 2401(b); 28 U.S.C. 2675(a); 28 C.F.R. 14.2SF-95 is convenient but DOJ says it is not required if written notice includes the required information and a sum certain.

Airport ownership and claim rules

The 50 busiest US airports by 2024 boardings (FAA data), with who owns each one and which notice rule applies. Airports we could not verify are left out.

Verified government-claim rows from the FAA top-50 airport set
1Hartsfield/Jackson Atlanta International (ATL)Atlanta, GA - 52,511,402 CY2024 enplanementsCity of Atlanta Department of Aviationcity departmentGA city rule6 monthsO.C.G.A. § 36-33-5
2Dallas-Fort Worth International (DFW)Fort Worth, TX - 42,351,316 CY2024 enplanementsCities of Dallas and Fort Worth; governed by DFW Airport Boardairport board / joint city airportairport board / joint city airport rule6 monthsTex. Civ. Prac. & Rem. Code 101.101
3Denver International (DEN)Denver, CO - 40,012,895 CY2024 enplanementsCity and County of Denver Department of Aviationcity/county departmentcity/county department rule182 daysColo. Rev. Stat. 24-10-109
5Los Angeles International (LAX)Los Angeles, CA - 37,760,834 CY2024 enplanementsLos Angeles World Airports, City of Los Angelescity departmentcity department rule6 monthsCal. Gov. Code 911.2; Cal. Gov. Code 945.6
6John F Kennedy International (JFK)New York, NY - 31,466,102 CY2024 enplanementsPort Authority of New York and New Jersey airport system; airport operated under municipal lease/arrangementbi-state authoritybi-state authority rulenotice of claim at least 60 days before suit; suit within 1 year after accrualN.Y. Unconsol. Laws § 7107 / PANYNJ consent statute
9Orlando International (MCO)Orlando, FL - 27,859,783 CY2024 enplanementsGreater Orlando Aviation Authorityairport authorityairport authority rule3 yearsFla. Stat. § 768.28(6)
10Miami International (MIA)Miami, FL - 26,588,002 CY2024 enplanementsMiami-Dade County / Miami-Dade Aviation Departmentcounty departmentFL local rule3 yearsFla. Stat. § 768.28(6)
11Phoenix Sky Harbor International (PHX)Phoenix, AZ - 25,595,723 CY2024 enplanementsCity of Phoenix Aviation Departmentcity departmentcity department rule180 daysA.R.S. 12-821.01
12Seattle-Tacoma International (SEA)Seattle, WA - 25,414,592 CY2024 enplanementsPort of Seattleport authority / port districtport authority / port district rulewithin the applicable statute of limitations; suit wait 60 days after claim presentedRCW 4.96.020
13San Francisco International (SFO)San Francisco, CA - 25,078,968 CY2024 enplanementsCity and County of San Franciscocity/county departmentCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
14Newark Liberty International (EWR)Newark, NJ - 24,544,320 CY2024 enplanementsPort Authority of New York and New Jersey airport system; airport operated under municipal lease/arrangementbi-state authoritybi-state authority rulenotice of claim at least 60 days before suit; suit within 1 year after accrualN.Y. Unconsol. Laws § 7107 / PANYNJ consent statute
15George Bush Intcntl/Houston (IAH)Houston, TX - 23,349,157 CY2024 enplanementsCity of Houston / Houston Airportscity departmentTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
16General Edward Lawrence Logan International (BOS)Boston, MA - 21,090,721 CY2024 enplanementsMassachusetts Port Authority (Massport)port authorityport authority rule2 yearsMass. Gen. Laws ch. 258, § 4
17Minneapolis-St Paul International/Wold-Chamberlain (MSP)Minneapolis, MN - 18,054,481 CY2024 enplanementsMetropolitan Airports Commissionairport commissionairport commission rule180 daysMinn. Stat. § 466.05
18Fort Lauderdale/Hollywood International (FLL)Fort Lauderdale, FL - 17,096,131 CY2024 enplanementsBroward Countycounty departmentFL local rule3 yearsFla. Stat. § 768.28(6)
19Laguardia (LGA)New York, NY - 16,715,567 CY2024 enplanementsPort Authority of New York and New Jersey airport system; airport operated under municipal lease/arrangementbi-state authoritybi-state authority rulenotice of claim at least 60 days before suit; suit within 1 year after accrualN.Y. Unconsol. Laws § 7107 / PANYNJ consent statute
21Philadelphia International (PHL)Philadelphia, PA - 15,102,261 CY2024 enplanementsCity of Philadelphia Department of Aviationcity departmentPA local rule6 months42 Pa. Cons. Stat. § 5522(a)
22Salt Lake City International (SLC)Salt Lake City, UT - 13,543,570 CY2024 enplanementsSalt Lake City Department of Airportscity departmentUT local rule1 yearUtah Code §§ 63G-7-401, 63G-7-402, 63G-7-403
23Baltimore/Washington International Thurgood Marshall (BWI)Glen Burnie, MD - 13,221,461 CY2024 enplanementsMaryland Aviation Administrationstate agencyMD state rule1 yearMd. Code, State Gov't § 12-106
25San Diego International (SAN)San Diego, CA - 12,780,013 CY2024 enplanementsSan Diego County Regional Airport Authorityairport authorityairport authority rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
27Tampa International (TPA)Tampa, FL - 12,075,591 CY2024 enplanementsHillsborough County Aviation Authorityairport authority / independent special districtairport authority / independent special district rule3 yearsFla. Stat. § 768.28(6)
29Austin-Bergstrom International (AUS)Austin, TX - 10,678,073 CY2024 enplanementsCity of Austin Aviationcity departmentTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
30Daniel K Inouye International (HNL)Honolulu, HI - 10,449,022 CY2024 enplanementsState of Hawaii Department of Transportationstate agencystate agency ruleNo mandatory pre-suit notice identified; informal claims generally must be resolved or sued within 2 yearsHRS ch. 662; HRS § 662-4; DAGS Risk Management Office guidance
31Chicago Midway International (MDW)Chicago, IL - 10,360,093 CY2024 enplanementsCity of Chicago Department of Aviationcity departmentcity department ruleNo general pre-suit notice; civil action generally within 1 year745 ILCS 10/8-101
32Dallas Love Field (DAL)Dallas, TX - 8,654,991 CY2024 enplanementsCity of Dallas Department of Aviationcity departmentTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
33Portland International (PDX)Portland, OR - 8,639,088 CY2024 enplanementsPort of Portlandport authorityport authority rule180 daysOr. Rev. Stat. § 30.275
36William P Hobby (HOU)Houston, TX - 7,116,967 CY2024 enplanementsCity of Houston / Houston Airportscity departmentTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
37Sacramento International (SMF)Sacramento, CA - 6,679,426 CY2024 enplanementsCounty of Sacramento Department of Airportscounty departmentCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
38Louis Armstrong New Orleans International (MSY)Kenner, LA - 6,537,092 CY2024 enplanementsCity of New Orleans / New Orleans Aviation Boardcity aviation boardcity aviation board ruleNo general pre-suit notice requirement identified; request service within 90 days after commencing actionLa. Rev. Stat. § 13:5107(B), (D)
41Norman Y Mineta San Jose International (SJC)San Jose, CA - 5,822,019 CY2024 enplanementsCity of San Josecity departmentCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
42San Antonio International (SAT)San Antonio, TX - 5,466,684 CY2024 enplanementsCity of San Antonio Aviation Departmentcity departmentTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
43Southwest Florida International (RSW)Fort Myers, FL - 5,425,293 CY2024 enplanementsLee County Port Authoritydependent special district / port authoritydependent special district / port authority rule3 yearsFla. Stat. § 768.28(6)
44John Wayne/Orange County (SNA)Santa Ana, CA - 5,370,273 CY2024 enplanementsCounty of Orangecounty departmentCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
45Oakland San Francisco Bay (OAK)Oakland, CA - 5,292,736 CY2024 enplanementsPort of Oaklandport authorityport authority rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
46Indianapolis International (IND)Indianapolis, IN - 5,181,947 CY2024 enplanementsIndianapolis Airport Authorityairport authority / municipal corporationairport authority / municipal corporation rule180 daysInd. Code §§ 34-13-3-8, 34-13-3-11, 34-13-3-13
48Pittsburgh International (PIT)Pittsburgh, PA - 4,862,376 CY2024 enplanementsAllegheny County Airport Authorityairport authorityairport authority rule6 months42 Pa. Cons. Stat. § 5522(a)

Transit agencies

Large transit agencies, with who runs each one and which notice rule applies. Amtrak is not listed: it is not a federal agency, and we found no government notice-of-claim rule for it.

Verified government-claim rows for transit agencies
1MTA New York City TransitNew York, NY - 2,902,019 thousand 2024 ridersNew York City Transit Authority / MTApublic benefit corporation / authoritypublic benefit corporation / authority rulenotice of claim within GML 50-e time, generally 90 days; tort suit within 1 year and 90 daysN.Y. Pub. Auth. Law § 1212; N.Y. Gen. Mun. Law § 50-e
3Los Angeles County Metropolitan Transportation AuthorityLos Angeles, CA - 302,612 thousand 2024 ridersLos Angeles County Metropolitan Transportation Authoritycounty transportation authorityCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
5Massachusetts Bay Transportation AuthorityBoston, MA - 251,725 thousand 2024 ridersMassachusetts Bay Transportation Authoritypolitical subdivision / transit authorityMA local rule2 yearsMass. Gen. Laws ch. 258, § 4
6New Jersey Transit CorporationNewark/New York, NJ - 222,475 thousand 2024 ridersNew Jersey Transit Corporationstate public transportation corporationNJ state rule90 daysN.J. Stat. Ann. § 59:8-8; NJ Treasury Division of Risk Management
7Southeastern Pennsylvania Transportation AuthorityPhiladelphia, PA - 200,712 thousand 2024 ridersSoutheastern Pennsylvania Transportation Authoritystate-created transit authorityPA local rule6 months42 Pa. Cons. Stat. § 5522(a)
8City and County of San Francisco / SFMTASan Francisco, CA - 160,544 thousand 2024 ridersSan Francisco Municipal Transportation Agencycity/county departmentCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
9MTA Bus CompanyNew York, NY - 126,617 thousand 2024 ridersMetropolitan Transportation Authority subsidiary / related entitypublic benefit corporation / MTA subsidiarypublic benefit corporation / MTA subsidiary ruleclaim/demand at least 30 days before suit; no GML 50-e notice of claim requiredN.Y. Pub. Auth. Law § 1276
10MTA Long Island Rail RoadNew York, NY - 97,221 thousand 2024 ridersMetropolitan Transportation Authority subsidiary / related entitypublic benefit corporation / MTA subsidiarypublic benefit corporation / MTA subsidiary ruleclaim/demand at least 30 days before suit; no GML 50-e notice of claim requiredN.Y. Pub. Auth. Law § 1276
11King County MetroSeattle, WA - 88,639 thousand 2024 ridersKing County Metrocounty transit departmentWA local rulewithin applicable limitations period before suit; wait 60 days after presentmentWash. Rev. Code § 4.96.020
12County of Miami-Dade Transportation and Public WorksMiami, FL - 88,250 thousand 2024 ridersMiami-Dade County Department of Transportation and Public Workscounty departmentFL local rule3 yearsFla. Stat. § 768.28(6)
13Metropolitan Transit Authority of Harris County, TexasHouston, TX - 75,859 thousand 2024 ridersMetropolitan Transit Authority of Harris County, Texasmetropolitan transit authorityTX local rule6 monthsTex. Civ. Prac. & Rem. Code § 101.101
14San Diego Metropolitan Transit SystemSan Diego, CA - 75,683 thousand 2024 ridersSan Diego Metropolitan Transit SystemCalifornia public agencyCA local rule6 months for death, personal injury, or personal property; 1 year for other claimsCal. Gov. Code §§ 911.2, 915, 945.6
15MTA Metro-North RailroadNew York, NY - 74,396 thousand 2024 ridersMetropolitan Transportation Authority subsidiary / related entitypublic benefit corporation / MTA subsidiarypublic benefit corporation / MTA subsidiary ruleclaim/demand at least 30 days before suit; no GML 50-e notice of claim requiredN.Y. Pub. Auth. Law § 1276

Methodology and limits

Notice of claim is not the same as the statute of limitations. A notice rule can be a step before a lawsuit, and the lawsuit deadline can be different.

Exceptions vary. Minors, late-claim petitions, disability tolling, agency-specific forms, and special road-defect rules can change what happens next.

Data is current as of . Each rule was checked against official or primary sources. Rules we could not confirm are not shown.

Send corrections through the corrections page. Download the CSV. People's Justice publishes this compilation under CC BY 4.0; it is free to republish with credit.